Epoxy ceramic floor paint
Product attachments:
I. Product Introduction
Epoxy ceramic floor paint is a coating made of epoxy resin and ceramic materials. It is a floor paint with excellent performance, strong decoration, strong practicability, good environmental protection, especially beautiful and long-lasting. It appeared in Europe and the United States in the late last century and has been widely used. This floor paint adopts an integral polymer surface layer, and the main components are epoxy resin and curing agent.
II. Product Features:
First of all, it has excellent corrosion resistance and can resist the erosion of chemical media. This is mainly due to the chemical resistance of epoxy resin and its good adhesion, high mechanical strength, good toughness and other comprehensive properties.
Secondly, epoxy ceramic floor paint has excellent decoration. Its appearance is rich in color and has good gloss, which can provide a beautiful and elegant decoration effect for the ground.
In addition, it is also practical, with excellent physical and mechanical properties and excellent wear resistance and impact resistance, so it can be used in ground decoration in various occasions. At the same time, it is also environmentally friendly, with no solvent volatile emissions and no heavy metal elements, which meets green environmental protection requirements.
III. Scope of application
It is widely used in hospitals, food factories, workshops, underground parking lots and other places that need to maintain a high degree of hygiene and beauty. It can effectively improve the operating environment of factory workshops, meet environmental protection requirements, reduce dust and ground moisture, and improve production efficiency and work comfort.
IV. Technical indicators:
|
Paint film: various colors; the paint film is smooth and flat |
Adhesion (1mm grid) level: ≤1 |
|
Viscosity (25°C): 400±200CPS |
Impact resistance KgNaN: ≥70 |
|
Drying time h: surface dry ≤4h, hard dry ≤24h |
Alkali resistance, 30%NaOH, 48h: good |
|
Pencil hardness: ≥2H |
Acid resistance, 30%H2SO4; 48h: good |
|
Wear resistance, 500g, 1000 revolutions, g: ≤0.2 |
Ratio: Main agent: Hardener=4:1 |
|
Bending test: ≤1mm |
Water resistance for 30 days: no blistering |
V. Construction process and steps:
Base surface treatment:
1. Clean and inspect the base: After cleaning or vacuuming the base surface, check whether there are cracks or hollow shells on the base. If there are any, deep cut and clean them, and then fill them with epoxy mortar. Do not knock them barbarously during cleaning to avoid loosening the base layer on the side.
First pass: Epoxy sealing primer construction:
Primer ratio [Epoxy sealing primer A1 kg: Epoxy sealing primer B1 kg], before construction, first stir the primer A and primer B evenly, then mix them according to the ratio, stir thoroughly for about 3 minutes, and then you can start construction. It needs to be used up within 60 minutes. After the primer surface is dry (4 to 5 hours), the topcoat can be applied.
Second pass: Epoxy ceramic floor topcoat construction:
Topcoat ratio [Epoxy ceramic floor topcoat 4 kg: Epoxy topcoat curing agent 1 kg], before construction, first stir the paint thoroughly for 2~3 minutes, then mix it with the curing agent according to the ratio, and stir thoroughly for 3~5 minutes before construction. It needs to be used up within 50 minutes.
The usable time of this product is about 30 minutes when it is above 25°C. Please determine the amount of each batch according to the actual temperature and construction progress. The prepared materials must be used up at one time, and the remaining A/B components must be sealed and stored.
. On-site cleaning and maintenance, floor maintenance
After the topcoat is completed, move the relevant construction materials and tools away from the site,
People are allowed to enter and walk only after at least 72 hours. Do not bring in garbage such as sediment.
The paint film usually needs 7 days to completely cure. During this period, other construction, handling, installation and other construction should be avoided.
VI. Storage and safety protection:
The product should be stored in a cool and ventilated place, protected from direct sunlight, and isolated from fire and heat.
Keep the construction process dry and clean, and strictly prohibit contact with water, acid, alcohol, alkali, etc.; the curing agent packaging barrel must be tightly closed after the paint is mixed to avoid gelling.
Operators should wear safety protective masks and gloves to avoid contact with skin or eyes. If contact occurs accidentally, rinse with water.
Youyang Chemical is committed to working together with all partners to achieve shared success. We understand that every collaboration presents both new opportunities and challenges. Youyang Chemical boasts not only advanced production technology but also a dedicated team committed to R&D and innovation, constantly striving for breakthroughs and excellence. Our products, quality, and service are designed to open a new chapter in your beautiful life. We firmly believe that through our joint efforts, we will create greater value and achieve a win-win situation. Youyang Chemical looks forward to collaborating with you to jointly chart a grand blueprint for the future. Let us work together to create a better tomorrow!
Product Inquiry
Contact our team in time and we will be happy to help you.